Monday 13 August 2012

More progress on the loft conversion

Plasterboard wall construction with galvanised steel frame behind: Uploaded from the Photobucket Android App Uploaded from the Photobucket Android App Uploaded from the Photobucket Android App Plasterboards all the way up to the ceiling: Uploaded from the Photobucket Android App Uploaded from the Photobucket Android App Boarding behind roof triangle to make a separate partitioned room inside the loft (as a secondary bedroom/ kitchenette Uploaded from the Photobucket Android App

No comments:

Post a Comment